BRD Completes Meituan Saudi Cold Room Project Within 60 Days

In the rapidly expanding global cold chain logistics industry, speed and precision define competitiveness. BRD once again set a new standard by completing Meituan’s high-standard cold storage facility in Saudi Arabia — a 4,000 m² turnkey cold room project delivered in only 60 days from design to commissioning.

Turnkey Cold Room Solution for the Middle East Market

The project includes complete refrigeration systems, cold room panels, PIR sandwich panels, and on-site installation, demonstrating BRD’s full-process capability in industrial cold room and warehouse construction.

Operating under extreme desert conditions, BRD engineers customized a comprehensive insulation and refrigeration solution that ensures both thermal stability and energy efficiency for long-term operation.

Precision Planning and Fast Execution

Facing an extremely tight schedule — only 15 days for on-site construction — BRD utilized its digital project management system and international logistics network to streamline every phase of the process.

All cold room panels were prefabricated at BRD’s automated production base, ensuring dimensional accuracy and quick modular assembly once shipped to site.

The facility is equipped with Bitzer high-efficiency condensing units, providing reliable and stable refrigeration performance even under Saudi Arabia’s high-temperature climate.

 

High-Performance PIR Sandwich Panels for Cold Storage

At the heart of the system are BRD’s 100 mm PIR sandwich panels, which deliver outstanding thermal insulation, fire safety, and moisture resistance.

Compared with conventional cold room panel materials, BRD’s panels feature:

Lower thermal conductivity (≤ 0.023 W/m·K) for maximum energy savings

B1 fire-rated core for enhanced safety

Tight joint and hidden-screw design, preventing condensation and leakage

Durable surface finishes suitable for hygienic food-grade cold rooms and logistics warehouses

These features guarantee a stable low-temperature environment while reducing energy consumption and maintenance costs over time.

Professional Execution and Client Commitment

To meet the demanding timeline, BRD mobilized additional on-site teams and machinery, maintaining 24-hour construction cycles to keep the project on track.

“A commitment is a commitment,” said Tim Huang, Project Manager of BRD. “Despite the regional challenges and fast pace, our team’s experience and precision engineering ensured on-schedule, high-quality delivery that exceeds the client’s expectations.”

Expanding BRD’s Global Cold Chain Footprint

The successful completion of the Meituan Saudi cold room project marks a major milestone for BRD’s international operations. It reinforces the company’s growing reputation as a trusted supplier of sandwich panel and cold room panel solutions for cold storage warehouses, food processing plants, and logistics centers worldwide.

 

By integrating innovative PIR sandwich panel technology with professional engineering and rapid response, BRD continues to create value for global clients, shaping the future of energy-efficient cold room construction and sustainable industrial refrigeration.

 

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Welcome To Brdeco ×
I 'd like to know more about your products